Gröna Lund planning a new inverted coaster in 2020

Gröna Lund has applied for planning permission to build a new inverted roller coaster in 2020.

The as yet unnamed new ride is to be manufactured by Bolliger & Mabillard, it will be 112 ft tall, reach a top speed of 62 mph and feature 4 inversions; a Zero-G Roll, 2 corkscrews and a heartline roll.

In 2017, PortAventura World opened Ferrari Land, a brand new theme park dedicated to the prestigious Italian firm. This year they will add a new kids' area with 5 attractions.

Ferrari Land is a theme park unique in Europe with 70,000 m2 of attractions as well as restaurants, shops and shows that all embody the spirit of Ferrari.

The current attractions aimed at children include the Maranello Grand Race racing circuit, Junior Championship 'whip' ride and Kids' Podium play area.

On 1 July 2019, Walibi Holland will open the first hybrid roller coaster in Europe.

The present wooden roller coaster Robin Hood is being rebuilt by Rocky Mountain Construction into a roller coaster consisting of a combination of wood and steel.

Until October 2018, guests can still enjoy the current Robin Hood, after which it will be converted into a completely new roller coaster.

I Corsari, the iconic dark ride at Gardaland, is undergoing a substantial renovation for 2018, including the addition of new 3D video projection mapping technology and a new soundtrack.

When it opened to visitors in 1992 the I Corsari dark ride was the biggest projects ever completed in an Italian theme park. Its construction involved working with as many as 30 partners – Italian and American, over 3 years and an overall investment of 60 billion liras.

Walibi Belgium has plans to transform the theme park over the next 5 years and will invest more than 100 million euros. 

The first additions will be seen this year, with a new family roller coaster in a completely re-themed exotic area for 2018.

Not only will new attractions be added each year, but until 2022/23 each zone of the theme park will be completely refreshed in terms of theming, design and experience so that at the end of this historic investment plan 75% of the theme park will be renewed.